HomeServices › Windows
WINDOWS
MAPPING & QUANTIFICATION
← All Services
EnvelopeCSI 08 51 00 / 08 44 00
SCOPE OF WORK

Window frame, glazing seal, and perimeter sealant condition surveys with unit-by-unit documentation and repair quantity takeoffs.

Applicable Standards

AAMA 501.2, 502, 503; ASTM E1105, E783, E330, E331, E2112; FBC Florida Product Approval; NFRC 100/200; ASHRAE 90.1

Window & Curtain Wall Assessment
  • Visual condition survey: document all failed sealant, cracked glass, condensation, and frame deficiencies.
  • Water hose testing (AAMA 501.2): minimum 3 representative openings per elevation.
  • Air leakage testing (ASTM E783): quantify air infiltration at selected windows and CW units.
  • IR thermography: identify thermal bridging, condensation risk zones, and insulation deficiencies.
  • Wet seal service life assessment: age, durometer, adhesion condition, movement crack evidence.
Wet Seal Replacement
  • Remove all glass-to-frame and frame-to-wall sealants; clean with appropriate solvent; allow to dry 4 hours.
  • Apply structural silicone (DOWSIL 983, Tremco Proglaze ETA, or equal) by certified applicator.
  • Tool all joints to smooth concave profile; post-installation water test on minimum 10% of completed seals.
IGU Replacement
  • Standard (non-impact): specify U-value and SHGC per ASHRAE 90.1 / NFRC; minimum U-0.25.
  • Impact-rated (FBC/HVHZ): Florida Product Approval required; PGT, CGI, WinDoor, or approved equal.
  • High-performance: U-0.18 or better for LEED and energy code upgrade applications.
  • Coordinate with structural for curtain wall anchor capacity to carry weight of new glass units.
Perimeter Flashing & Air Barrier
  • Install flexible flashing tape at all frame-to-wall interfaces; integrate with building WRB / air barrier.
  • All four sides of each opening; lap minimum 3" onto adjacent WRB and onto frame.
  • Approved tapes: Huber ZIP System Tape, 3M 8067, Henry Blueskin VP100, Pro Clima products.
Historic Window Restoration
  • Wood frame: epoxy consolidant for rot repair; replacement sections where beyond repair.
  • Glazing compound: remove all failed putty; reglaze with linseed oil or synthetic compound.
  • Hardware: clean and lubricate all operable hardware; replace sash cords, balances, and latches as needed.
Explore all services
MORE SERVICES
01
Concrete Repair
02
Coatings
03
Masonry
04
Sealants
05
Expansion Joints
06
Epoxy Injection
07
Grout Injection
08
Foundations
09
CMU
10
CIP Concrete
11
Precast Concrete
12
Steel
13
Facades
14
Windows
15
Siding
16
Paint